Home page
Geotextile tubes in detail
Geotextiles Realisation
About Trasomar
Trasomar References
Mare nostrum
Mare nostrum – Saint-Tropez
J.B. PASTOR & FILS GROUP
Home page
Geotextile tubes in detail
Geotextiles Realisation
About Trasomar
Trasomar References
Mare nostrum
Mare nostrum – Saint-Tropez
J.B. PASTOR & FILS GROUP
EN
FR
Trasomar Reference
Accueil
>
References / Realisations
>
Realization of a yacht mooring – Saint Tropez – 2021
Realization of a yacht mooring – Saint Tropez – 2021
Type of works:
Realization of an ecological yacht mooring composed by metal structure and setting up mooring chain
Contracting authority:
SONATA YACHTING LIMITED
Project manager:
Corinthe Ingénierie
Duration :
1.5 Months
Operations and main quantities :
Positioning the metal structure
Carrying out a pull-out test with an underwater drill: Type of Bar: Dywi drill R51/ Drilling length: 12 ml / Drilling diameter: 115 mm / Bar fixing
Carrying out a pull-out test at 45-ton on the bar
Fixing 8 bar with an underwater drill: Type of Bar: Dywi drill R51 / Drilling length: 12 ml / Drilling diameter: 115 mm / Bar fixing
Carrying out a conformity pull-out test at 15-ton on the fixed structure
Setting up mooring chain
Carrying out a pull-out test on the fixed structure
Setting up mooring chain with a submarine buoy, intermediate chest, and the main chest
Main issues
Site exposed to swell.
25 meters deep works.
FIGHT AGAINST THE EROSION « PLAGE DU RAYOL » EAST/WEST CONSERVATION OF COAST - 2020
Plage du Rayol
Discover the realisation
Maintenance of maritime structures – Repair of the foundation of the “parking des pêcheurs”- Monaco - 2023
Monaco
Discover the Trasomar reference