Type of works : Creation of a riprap dike, a protective wall in the beach, rainwater drains and suction into the sea for a swimming pool
Contracting authority : Cannes Seaside S.A
Project manager : Pierre Louis
Time frame : 18 months
Operations and main quantities :
Creation of a 2/4 ton riprap protective dike (1600T)
Creation of a concrete structure, with riprap percolation, serving as an anti-scour wall to protect the properties built on the beach: 120ml by 1.3m wide
Creation of a stormwater drainage system using HDPE pipes ∅300 and 500 over 80 linear meters, with concrete saddles for protection and ballasting
Installation of a 110 mm seawater suction pipe for the swimming pool, with a concrete anchor block and strainer at the end
Detailed report
FIGHT AGAINST THE EROSION « PLAGE DU RAYOL » EAST/WEST CONSERVATION OF COAST - 2020 Plage du Rayol