Home page
Geotextile tubes in detail
Geotextiles Realisation
About Trasomar
Trasomar References
Mare nostrum
Mare nostrum – Saint-Tropez
J.B. PASTOR & FILS GROUP
Home page
Geotextile tubes in detail
Geotextiles Realisation
About Trasomar
Trasomar References
Mare nostrum
Mare nostrum – Saint-Tropez
J.B. PASTOR & FILS GROUP
EN
FR
Trasomar Reference
Accueil
>
References / Realisations
>
Anse du Portier (Portier’s Cove): Sea Outfall – R300 Larvotto – Monaco – 2017
Anse du Portier (Portier’s Cove): Sea Outfall – R300 Larvotto – Monaco – 2017
Nature of the structure :
Deployment of the sea outfall of the Larvotto rainwater network
Contracting authority :
Public Works Department
Designer :
BOUYGUES TP MONACO
Time frame :
10 months
Services and main quantities
Removing / installing stone blocks of 8 / 10T: 3,500T by sea
Upstream connection to the chamber: 30 ml nozzle core sheet metal diam. 2,200
Storm water overflow- 20m x 10m x 6m: Work cast in place
Ballast footing from -3m to -3.0m deep: 2,600 m² in ballast of 20 / 40mm, adjusted to + - 10cm by divers
Sea outfall: 295 ml nozzle core sheet metal diam. 2,500
Overflow at sea: 30 ml nozzle core sheet metal diam. 2,500
Laying of 129 ballast mats of 10T / U: 13ml x 2m x 0.15m
Removal of an existing steel outfall of diam. 2,000: 300 ml
Establishment of cathodic protection
FIGHT AGAINST THE EROSION « PLAGE DU RAYOL » EAST/WEST CONSERVATION OF COAST - 2020
Plage du Rayol
Discover the realisation
Maintenance of maritime structures – Repair of the foundation of the “parking des pêcheurs”- Monaco - 2023
Monaco
Discover the Trasomar reference