Realization of a yacht mooring – Saint Tropez – 2021

  • Type of works: Realization of an ecological yacht mooring composed by metal structure and setting up mooring chain
  • Contracting authority: SONATA YACHTING LIMITED
  • Project manager: Corinthe Ingénierie
  • Duration : 1.5 Months

Operations and main quantities :

  • Positioning the metal structure
  • Carrying out a pull-out test with an underwater drill: Type of Bar: Dywi drill R51/ Drilling length: 12 ml / Drilling diameter: 115 mm / Bar fixing
  • Carrying out a pull-out test at 45-ton on the bar
  • Fixing 8 bar with an underwater drill: Type of Bar: Dywi drill R51 / Drilling length: 12 ml / Drilling diameter: 115 mm / Bar fixing
  • Carrying out a conformity pull-out test at 15-ton on the fixed structure
  • Setting up mooring chain
  • Carrying out a pull-out test on the fixed structure
  • Setting up mooring chain with a submarine buoy, intermediate chest, and the main chest

Main issues

  • Site exposed to swell.
  • 25 meters deep works.
FIGHT AGAINST THE EROSION « PLAGE DU RAYOL » EAST/WEST CONSERVATION OF COAST - 2020
Plage du Rayol
Discover the realisation
Maintenance of maritime structures – Repair of the foundation of the “parking des pêcheurs”- Monaco - 2023
Monaco
Discover the Trasomar reference