Marine facilities for the 2024 Olympic Games – Marseille – France – 2023

  • Type of the works : Marine facilities in Marseille for the 2024 Olympic Games
  • Contracting authority : City of Marseille
  • Project manager : INGEROP Conseil & Ingénierie
  • Duration : 12 months

Operations and main quantities :

  • General implementation of the structures
  • Removal and disposal of concrete docks located north of the basin
  • Removal of mooring blocks and chains from on the basin
  • General earthworks selection = 3,000 m3
  • Removal 4/6 T, blocks from breakwater = 2,500 m3
  • Creation of 2 structures 32 ml made of precast concrete frames of section 7m x 2.5m crossing the existing dikes
  • Installation of a concrete dock made of precasted frase and protected bag elements = 84 ml
  • all-comers = 1,200 m3
  • 100/300 kg = 1000 m3
  • 4/6 T = 2,000 m3
  • Installation of 110 units 5 t mooring blocks in the basin
  • Installation of new aluminium pontoons and gangways
  • Supply and installation of mooring bollards
FIGHT AGAINST THE EROSION « PLAGE DU RAYOL » EAST/WEST CONSERVATION OF COAST - 2020
Plage du Rayol
Discover the realisation
Maintenance of maritime structures – Repair of the foundation of the “parking des pêcheurs”- Monaco - 2023
Monaco
Discover the Trasomar reference