Marine facilities for the 2024 Olympic Games – Marseille – France – 2023
Marine facilities for the 2024 Olympic Games – Marseille – France – 2023
Type of the works :
Marine facilities in Marseille for the 2024 Olympic Games
Contracting authority :
City of Marseille
Project manager :
INGEROP Conseil & Ingénierie
Duration :
12 months
Operations and main quantities :
General implementation of the structures
Removal and disposal of concrete docks located north of the basin
Removal of mooring blocks and chains from on the basin
General earthworks selection = 3,000 m3
Removal 4/6 T, blocks from breakwater = 2,500 m3
Creation of 2 structures 32 ml made of precast concrete frames of section 7m x 2.5m crossing the existing dikes
Installation of a concrete dock made of precasted frase and protected bag elements = 84 ml
all-comers = 1,200 m3
100/300 kg = 1000 m3
4/6 T = 2,000 m3
Installation of 110 units 5 t mooring blocks in the basin
Installation of new aluminium pontoons and gangways
Supply and installation of mooring bollards
FIGHT AGAINST THE EROSION « PLAGE DU RAYOL » EAST/WEST CONSERVATION OF COAST - 2020
Plage du Rayol
Discover the realisation
Maintenance of maritime structures – Repair of the foundation of the “parking des pêcheurs”- Monaco - 2023
Monaco
Discover the Trasomar reference