Home page
Geotextile tubes in detail
Geotextiles Realisation
About Trasomar
Trasomar References
Mare nostrum
Mare nostrum – Saint-Tropez
J.B. PASTOR & FILS GROUP
Home page
Geotextile tubes in detail
Geotextiles Realisation
About Trasomar
Trasomar References
Mare nostrum
Mare nostrum – Saint-Tropez
J.B. PASTOR & FILS GROUP
EN
FR
Trasomar Reference
Accueil
>
References / Realisations
>
MARSEILLE COASTLINE Repairs and refilling of the dike – 2021
MARSEILLE COASTLINE Repairs and refilling of the dike – 2021
Type of works:
Repairs and refilling of breakwater
Contracting authority:
Marseille
Project manager:
Ville de Marseille - Direction de la Mer et du Littoral
Duration :
2 months
Operations and main quantities :
Prophètes beach : Setting up 500-ton of 1/3-ton rocks / Adjustment of in-place rocks
L’Huveaune beach : Setting up 1200-ton of 1/3-ton rip-rap blocks / Adjustment of in-place rip-rap blocks
FIGHT AGAINST THE EROSION « PLAGE DU RAYOL » EAST/WEST CONSERVATION OF COAST - 2020
Plage du Rayol
Discover the realisation
Maintenance of maritime structures – Repair of the foundation of the “parking des pêcheurs”- Monaco - 2023
Monaco
Discover the Trasomar reference