Home page
Geotextile tubes in detail
Geotextiles Realisation
About Trasomar
Trasomar References
Mare nostrum
Mare nostrum – Saint-Tropez
J.B. PASTOR & FILS GROUP
Home page
Geotextile tubes in detail
Geotextiles Realisation
About Trasomar
Trasomar References
Mare nostrum
Mare nostrum – Saint-Tropez
J.B. PASTOR & FILS GROUP
EN
FR
Trasomar Reference
Accueil
>
References / Realisations
>
Installation of a floating pontoon – 2020
Installation of a floating pontoon – 2020
Type of works:
Installation of a floating pontoon providing access and departure point for water sports offered by the Beach Hotel.
Contracting authority:
Société des Bains de Mer
Project Manager :
Pierre LOUIS
Duration :
3 weeks
Operations and main quantities :
Installation of 16-ton moorings by sea: 4 units
Installation of anchors on land: 2 units
Installation of mooring ropes
Supply and lowering into the water of a floating pontoon by land 12ml * 2.5ml
Setting up the pontoon by sea
Main issues :
Presence of Posidonia meadows around the works area
Site exposed to swell
FIGHT AGAINST THE EROSION « PLAGE DU RAYOL » EAST/WEST CONSERVATION OF COAST - 2020
Plage du Rayol
Discover the realisation
Maintenance of maritime structures – Repair of the foundation of the “parking des pêcheurs”- Monaco - 2023
Monaco
Discover the Trasomar reference