Recovery of the moorings of the Port Hercule « La Cloche » – Monaco – 2024
Recovery of the moorings of the Port Hercule “La Cloche” – Monaco – 2024
Type of works :
Redevelopment of the "La Cloche" area – super-yacht mooring
Contracting authority :
Société d'Exploitation des Ports de Monaco
Project manager :
Pierre Louis Engineering
Time frame :
1 month of work
Operations and main quantities :
By sea, from a barge with a 250T "lattice boom" crane on board:
Relocation of 2 existing moorings of 500t each composed of 11 donuts of 45t each on a metal base
Supply and installation of a 250t mooring consisting of:
A metal frame
6 reinforced concrete cubes of 36t each
Dimensioning and implementation of cathodic protection by sacrificial anodes
Work carried out in an active port
Precise installation of the moorings at the DGPS at a depth of 45
FIGHT AGAINST THE EROSION « PLAGE DU RAYOL » EAST/WEST CONSERVATION OF COAST - 2020
Plage du Rayol
Discover the realisation
Development of the Portier cove – Monaco – 2024
Monaco
Discover the Trasomar reference