Logo Trasomar Monaco

Trasomar Reference

Accueil > References / Realisations > TRANSPLANTATION DE LA POSIDONIE – Monaco – Larvotto & Fontvieille – 2017

TRANSPLANTATION DE LA POSIDONIE – Monaco – Larvotto & Fontvieille – 2017

  • Nature of the works: Transplantation of Posidonia meadow in the Larvotto marine reserve and in Fontvielle.
  • Contracting authority: DIRECTION DES TRAVAUX PUBLICS DE MONACO
  • Designer: BOUYGUES TP MONACO
  • Time Frame: 3 months.

Services and main quantities:

  • 30T long-reach excavator on a jack up barge with 40m legs
  • Use of a suitable transplanter
  • Transportation of the Posidonia in metal baskets covered with natural fibres
  • Creating holes in the seabed with a Toyo DP50 pump
  • Installing prefabricated 7T concrete planters
  • 500 m² of Posidonia meadow moved
  • 637 baskets replanted
FIGHT AGAINST THE EROSION « PLAGE DU RAYOL » EAST/WEST CONSERVATION OF COAST - 2020
Plage du Rayol
Discover the realisation
Maintenance of maritime structures – Repair of the foundation of the “parking des pêcheurs”- Monaco - 2023
Monaco
Discover the Trasomar reference