References / Realisations
>
Maintenance of maritime structures – Repair of the foundation of the “parking des pêcheurs”- Monaco – 2023
Maintenance of maritime structures – Repair of the foundation of the “parking des pêcheurs”- Monaco – 2023
Type of works :
Installation of cofferdam made of lego blocks + creation of a concrete reinforcement of the existing wall
Contracting authority :
Travaux Publics Monaco
Project manager :
Pierre Louis Ingénierie
Time frame :
3 months
Operations and main quantities :
Building of a temporary cofferdam made of 2.5T lego blocks used as protection during formwork, reinforcement and concrete pouring operations,
Ground leveling for formwork installation,
Drilling and steel anchors installation
Steel reinforcement, formwork installation and concrete pouring :
Phase 1 : 19.80 ml linear metter of wall / 23m3 of concrete,
Phase 2 : 11.70ml linear metter of wall / 32m3 of concrete,
Pouring carried out in the tidal zone,
Removal of the cofferdam and restoration of the site.
FIGHT AGAINST THE EROSION « PLAGE DU RAYOL » EAST/WEST CONSERVATION OF COAST - 2020
Plage du Rayol
Discover the realisation
Maintenance of maritime structures – Repair of the foundation of the “parking des pêcheurs”- Monaco - 2023
Monaco
Discover the Trasomar reference