Accueil > References / Realisations > Maintenance of maritime structures – Repair of the foundation of the “parking des pêcheurs”- Monaco – 2023

Maintenance of maritime structures – Repair of the foundation of the “parking des pêcheurs”- Monaco – 2023

  • Type of works : Installation of cofferdam made of lego blocks + creation of a concrete reinforcement of the existing wall
  • Contracting authority : Travaux Publics Monaco
  • Project manager : Pierre Louis Ingénierie
  • Time frame : 3 months

Operations and main quantities :

  • Building of a temporary cofferdam made of 2.5T lego blocks used as protection during formwork, reinforcement and concrete pouring operations,
  • Ground leveling for formwork installation,
  • Drilling and steel anchors installation
  • Steel reinforcement, formwork installation and concrete pouring :
  • Phase 1 : 19.80 ml linear metter of wall / 23m3 of concrete,
  • Phase 2 : 11.70ml linear metter of wall / 32m3 of concrete,
  • Pouring carried out in the tidal zone,
  • Removal of the cofferdam and restoration of the site.
FIGHT AGAINST THE EROSION « PLAGE DU RAYOL » EAST/WEST CONSERVATION OF COAST - 2020
Plage du Rayol
Discover the realisation
Maintenance of maritime structures – Repair of the foundation of the “parking des pêcheurs”- Monaco - 2023
Monaco
Discover the Trasomar reference