Home page
Geotextile tubes in detail
Geotextiles Realisation
About Trasomar
Trasomar References
Mare nostrum
Mare nostrum – Saint-Tropez
J.B. PASTOR & FILS GROUP
Home page
Geotextile tubes in detail
Geotextiles Realisation
About Trasomar
Trasomar References
Mare nostrum
Mare nostrum – Saint-Tropez
J.B. PASTOR & FILS GROUP
EN
FR
Trasomar Reference
Accueil
>
References / Realisations
>
Maritime works along Sainte-Maxime’s beaches – Sainte Maxime – 2023-2024
Maritime works along Sainte-Maxime’s beaches – Sainte Maxime – 2023-2024
Type of works :
Maritime and underwater development works on the coastline of Ste Maxime
Contracting authority :
City of Sainte-Maxime
Project manager :
Bureau d’Etudes ICTP
Time frame :
9 months
Operations and main quantities :
Underwater dredging : 147 m3
Supply and installation of steel piles (diam 800mm) : 64.80 ml
Installation of new concrete pontoons : 52 m3
Installation of new aluminium pontoons : 25.50 m2
Installation of new aluminium footbridge : 9 ml
Supply and installation of steel piles (diam 800mm) 120 ml
Supply and installation of steel piles (diam 600mm) 140 ml
Underwater logging : 2 m3
Underwater structural reinforcement of an existing pontoon and connection: 6.5 ml
FIGHT AGAINST THE EROSION « PLAGE DU RAYOL » EAST/WEST CONSERVATION OF COAST - 2020
Plage du Rayol
Discover the realisation
Development of the Portier cove – Monaco – 2024
Monaco
Discover the Trasomar reference