Maritime works along Sainte-Maxime’s beaches – Sainte Maxime – 2023-2024

  • Type of works : Maritime and underwater development works on the coastline of Ste Maxime
  • Contracting authority : City of Sainte-Maxime
  • Project manager : Bureau d’Etudes ICTP
  • Time frame : 9 months

Operations and main quantities :

  • Underwater dredging : 147 m3
  • Supply and installation of steel piles (diam 800mm) : 64.80 ml
  • Installation of new concrete pontoons : 52 m3
  • Installation of new aluminium pontoons : 25.50 m2
  • Installation of new aluminium footbridge : 9 ml
  • Supply and installation of steel piles (diam 800mm) 120 ml
  • Supply and installation of steel piles (diam 600mm) 140 ml
  • Underwater logging : 2 m3
  • Underwater structural reinforcement of an existing pontoon and connection: 6.5 ml
FIGHT AGAINST THE EROSION « PLAGE DU RAYOL » EAST/WEST CONSERVATION OF COAST - 2020
Plage du Rayol
Discover the realisation
Development of the Portier cove – Monaco – 2024
Monaco
Discover the Trasomar reference