  • Type of works : Installation of sea outfalls for R280 and EP Fairmont Extension networks
  • Contracting authority : DIRECTION DES TRAVAUX PUBLICS DE MONACO
  • Project manager : BOUYGUES TP MONACO
  • Duration : 4 phases of work over 2 years

Operations and main quantities :

  • Laying riprap 1/3T : 2900T
  • Laying riprap 0.3/1 T : 150 T
  • Removing/relaying riprap 6/10T
  • Underwater rock excavation using a pontoon and 120t long-reach excavator: 950m3
  • Installation and adjustment of material 20/150 : 300T
  • Underwater dredging work = 150 m3
  • Adjustment of the outfall base : 2590 m²
  • Cutting sections 7 and 8 of the outfall pipe at Seyne sur Mer, in Monaco
  • Installing 1 section of the outfall pipe in HDPE diam. 2500 : 40 ml - 56T for installation n. 4
  • Installing 3 sections of the outfall pipe in HDPE diam. 2500: 65T for installation n. 2
  • Installing 2 sections of the outfall pipe in HDPE diam. 1400 : 30T for installation n. 2
  • Underwater saddle connections
  • Installation of outfall ballasting collars: 41U
  • Cathodic protection of the elements
  • Concrete (Bouchon) ballast’s pipeline: 110m3
  • Backfill 20/40 : 2500 T
FIGHT AGAINST THE EROSION « PLAGE DU RAYOL » EAST/WEST CONSERVATION OF COAST - 2020
Plage du Rayol
Discover the realisation
Maintenance of maritime structures – Repair of the foundation of the “parking des pêcheurs”- Monaco - 2023
Monaco
Discover the Trasomar reference