Construction of the dike Récifale

  • Nature of the works: Construction of an underwater dike located a hundred meters from the shore, to protect the beach of the Beach Hotel from swell.
  • Contracting authority: Société des Bains de Mer
  • Project Manager: Pierre LOUIS
  • Time frame: 10 months.

Services and quantities:

  • Trenching: 3 300 m3
  • Supply and transportation by land and installation of a core TVC 10/200kg: 11 300 T
  • Supply and rocks ranging from 500/800 kg to 6/8T by land and: 34 000 T
  • Installing stone blocks from the sea: 10 000 T

Main constraints:

  • Presence of Posidonia meadow around the site area
  • Site exposed to swell
  • Location of seawall and fallback areas far from the site
FIGHT AGAINST THE EROSION « PLAGE DU RAYOL » EAST/WEST CONSERVATION OF COAST - 2020
Plage du Rayol
Discover the realisation
Pile driving works for floating pontoons and wave attenuators - AGDE - 2023
Agde
Discover the Trasomar reference