Home page
Geotextile tubes in detail
Geotextiles Realisation
About Trasomar
Trasomar References
Mare nostrum
Mare nostrum – Saint-Tropez
J.B. PASTOR & FILS GROUP
Home page
Geotextile tubes in detail
Geotextiles Realisation
About Trasomar
Trasomar References
Mare nostrum
Mare nostrum – Saint-Tropez
J.B. PASTOR & FILS GROUP
EN
FR
Trasomar Reference
Accueil
>
References / Realisations
>
Development of the left bank of the Siagne – Mandelieu la Napoule – 2024
Development of the left bank of the Siagne – Mandelieu la Napoule – 2024
Type of works :
Reinforcement work on the banks of the Siagne on the left bank near the SNCF bridge
Contracting authority :
City of Mandelieu-la-Napoule
Project manager :
Egis
Time frame :
5.5 months
Operations and main quantities :
Combiwall + backfill :
47 piles diameter 864mm, thickness 10mm, length 14.5ml, by sea, in the direct vicinity of the SNCF bridge,
90 L604 sheet piles, length 9ml, by sea,
Creation of 94ml of crown beam (reinforcement, formwork, pouring) – width 1.20ml / height 1ml – implementation of needle formwork,
Backfilling with 40/80mm ballast – 2,900m3,
Installation of geotextile under riprap between -4 and -6m deep – 620m²,
Installation of 800-1,200kg riprap blocks for filling a pit – 270m3,
Gateway :
2 piles diameter 864mm, thickness 10mm, length 12ml, by land at night – intermediate foundation of the footbridge,
Underwater coppicing of the 6 micro foundation piles upstream of the footbridge,
Underwater construction of a 3.65m3 concrete block around 6 micro piles (formwork, reinforcement, concrete),
Underwater coppicing of the 2 intermediate piles of the footbridge + the 3 downstream foundation piles,
Implementation of the intermediate header (4.25T steel) at night, by land (centimetre precision, adjustment by plungers),
Implementation of the downstream header (6T steel), by sea (centimetric precision, adjustment by plungers),
Implementation of the 2 footbridges (23m, 18.7T / 27.5m, 23T) upstream of the SNCF bridge and under the SNCF bridge, at night,
Implementation of 55 pre-slabs on the footbridge,
Implementation of a 5.5T ramp for access to the golf course's boat,
Reinforcement and pouring of a 165m² slab on the surface of the footbridge
FIGHT AGAINST THE EROSION « PLAGE DU RAYOL » EAST/WEST CONSERVATION OF COAST - 2020
Plage du Rayol
Discover the realisation
Development of the Portier cove – Monaco – 2024
Monaco
Discover the Trasomar reference