Home page
Geotextile tubes in detail
Geotextiles Realisation
About Trasomar
Trasomar References
Mare nostrum
Mare nostrum – Saint-Tropez
J.B. PASTOR & FILS GROUP
Home page
Geotextile tubes in detail
Geotextiles Realisation
About Trasomar
Trasomar References
Mare nostrum
Mare nostrum – Saint-Tropez
J.B. PASTOR & FILS GROUP
EN
FR
Trasomar Reference
Accueil
>
References / Realisations
>
Nemo GDH Project (BP) Dismantling of 12 » and 28 » sealines – Frontignan – 2024
Nemo GDH Project (BP) Dismantling of 12” and 28” sealines – Frontignan – 2024
Type of works :
Maritime and submarine works for the dismantling of sealines
Contracting authority :
GDH (BP) Frontignan
Project manager :
AECOM
Time frame :
1.5 months of work
PRESTATIONS ET PRINCIPALES QUANTITÉS :
By sea, from a barge with a 250T "lattice boom" crane on board:
Dredging of 4000 m3 of sandy material
Underwater cutting (between -4m and -6.50m depth) of steel sealines using a 15T LaBounty hydraulic shear
Dismantling of 175.5 ml of 12'' sealine
Dismantling of 248 ml of 28'' sealine
Maritime transport and disposal of cut sealines
Reclamation of steel waste (75 tons)
Treatment of hazardous waste (coal tar coating) at an approved facility.
Bathymetric surveys "before" and "after" work
Work carried out in shifts (2 x 8 hours)
Work carried out in the open sea on an exposed site
FIGHT AGAINST THE EROSION « PLAGE DU RAYOL » EAST/WEST CONSERVATION OF COAST - 2020
Plage du Rayol
Discover the realisation
Development of the Portier cove – Monaco – 2024
Monaco
Discover the Trasomar reference