Nemo GDH Project (BP) Dismantling of 12” and 28” sealines – Frontignan – 2024

  • Type of works : Maritime and submarine works for the dismantling of sealines
  • Contracting authority : GDH (BP) Frontignan
  • Project manager : AECOM
  • Time frame : 1.5 months of work

PRESTATIONS ET PRINCIPALES QUANTITÉS :

  • By sea, from a barge with a 250T "lattice boom" crane on board:
  • Dredging of 4000 m3 of sandy material
  • Underwater cutting (between -4m and -6.50m depth) of steel sealines using a 15T LaBounty hydraulic shear
  • Dismantling of 175.5 ml of 12'' sealine
  • Dismantling of 248 ml of 28'' sealine
  • Maritime transport and disposal of cut sealines
  • Reclamation of steel waste (75 tons)
  • Treatment of hazardous waste (coal tar coating) at an approved facility.
  • Bathymetric surveys "before" and "after" work
  • Work carried out in shifts (2 x 8 hours)
  • Work carried out in the open sea on an exposed site
FIGHT AGAINST THE EROSION « PLAGE DU RAYOL » EAST/WEST CONSERVATION OF COAST - 2020
Plage du Rayol
Discover the realisation
Development of the Portier cove – Monaco – 2024
Monaco
Discover the Trasomar reference