Pile driving works for floating pontoons and wave attenuators – AGDE – 2023
Pile driving works for floating pontoons and wave attenuators – AGDE – 2023
Type of works :
Supply and driving of piles, installation of aluminum pontoons and installation of wave attenuators
Contracting authority :
Société d’Aménagement d’Agde et du littoral (SODEAL)
Duration :
1 month
Operations and main quantities : Port development
Supply and installation of 19 steel piles (diameter 406mm and 508mm, length 14m and 13m) / coppicing,
Anti-corrosion coating by ACQPA paint,
Supply and implementation of pile caps,
Installation of aluminum floating pontoons with catways and access gangways,
Installation of concrete wave attenuator pontoon,
FIGHT AGAINST THE EROSION « PLAGE DU RAYOL » EAST/WEST CONSERVATION OF COAST - 2020
Plage du Rayol
Discover the realisation
Maintenance of maritime structures – Repair of the foundation of the “parking des pêcheurs”- Monaco - 2023
Monaco
Discover the Trasomar reference