Pile driving works for floating pontoons and wave attenuators – AGDE – 2023

  • Type of works : Supply and driving of piles, installation of aluminum pontoons and installation of wave attenuators
  • Contracting authority : Société d’Aménagement d’Agde et du littoral (SODEAL)
  • time frame : 1 month

SERVICES AND MAIN QUANTITIES: Port development

  • Supply and installation of 19 steel piles (diameter 406mm and 508mm, length 14m and 13m) / coppicing,
  • Anti-corrosion coating by ACQPA paint,
  • Supply and implementation of pile caps,
  • Installation of aluminum floating pontoons with catways and access gangways,
  • Installation of concrete wave attenuator pontoon,
FIGHT AGAINST THE EROSION « PLAGE DU RAYOL » EAST/WEST CONSERVATION OF COAST - 2020
Plage du Rayol
Discover the realisation
Pile driving works for floating pontoons and wave attenuators - AGDE - 2023
Agde
Discover the Trasomar reference